Project handover checklist template

A handover checklist makes sure the client gets everything they need to run what you installed: documents, training, closed snags, keys and passwords, warranties and a support route.

Free 7-day trial · no credit card required

7
Sections
28
Fields
10
Field types

What should a project handover checklist include?

A project handover checklist should confirm that snags are closed or agreed, test results and as-built records are issued, O&M manuals and warranties are handed over, users are trained, keys, fobs and admin access are passed on and logged, statutory and scheme paperwork such as the CDM health and safety file or an MCS handover pack is dealt with, and the client knows how to get support.

Last updated . Facts checked on 30 September 2026 against CDM 2015, regulation 12, Building Regulations 2010, regulation 38 and MCS MIS 3002: The Solar PV Installation Standard, issue 6.0.

Who uses it

The project manager or lead engineer, working through it with the client's facilities or operations contact.

When

In the last days of a project, before the sign-off walk-round, so nothing is still missing when the client signs.

In Integrio

Build it once in the Form Builder (Office User), attach it to projects, and your team fills it in on iOS or Android, offline if needed.

IntegrioFree template · integrio.app/forms/handover-checklist/

Project handover checklist template

A handover checklist makes sure the client gets everything they need to run what you installed: documents, training, closed snags, keys and passwords, warranties and a support route.

Project
Site
Completed by
Date

The template

What's in the handover checklist?

7 sections and 28 fields. Copy them into any format, print this page, or set the form up in Integrio.

  1. 1.Project

    1. 1.1

      CustomerRequired

      Text
    2. 1.2

      SiteRequired

      Text
    3. 1.3

      Project referenceRequired

      Text
    4. 1.4

      Handover dateRequired

      Date
    5. 1.5

      Client representative receiving handoverRequired

      Name and role.

      Text
  2. 2.Documents

    Mark each one. Anything 'To follow' needs a date.

    1. 2.1

      Handover documents

      CheckIssuedTo followN/A
      Test and commissioning results○○○
      As-installed product list with serial numbers (panels, inverters, batteries, chargers)○○○
      As-built drawings or marked-up layouts○○○
      O&M manuals○○○
      Manufacturer warranties○○○
      Certificates issued by the relevant trades, e.g. electrical installation certificate○○○
      Configuration backups, settings and monitoring portal details○○○
      Maintenance requirements and the customer's own checks○○○
      Checklist grid
    2. 2.2

      Documents to follow, owner and date

      ↳ Shown when any row is To follow

      Notes
    3. 2.3

      Upload the handover pack

      PDF or zip of everything issued.

      File upload
  3. 3.Statutory information

    Only some projects need these. Check who holds the duty.

    1. 3.1

      CDM health and safety file information passed to the principal designer or principal contractor

      • Yes
      • No
      • Not applicable
      Choose one
    2. 3.2

      MCS handover pack and certificate (solar PV and other MCS-certified work)

      The certificate is generated once the installation is registered on the MCS Installation Database.

      • Issued
      • Certificate to follow
      • Not applicable
      Choose one
    3. 3.3

      Fire safety information identified for the responsible person (Building Regulations reg. 38)

      • Yes
      • No
      • Not applicable
      Choose one
    4. 3.4

      Notes on statutory information

      ↳ Shown when any answer is No or to follow

      Notes
  4. 4.Training and demonstration

    1. 4.1

      User training givenRequired

      • Yes
      • No
      Yes / No
    2. 4.2

      Who was trained

      Names and roles.

      ↳ Shown when User training given is Yes

      Notes
    3. 4.3

      Training date

      ↳ Shown when User training given is Yes

      Date
    4. 4.4

      Reason and date for training

      ↳ Shown when User training given is No

      Notes
  5. 5.Snags

    1. 5.1

      Snag list statusRequired

      • All closed
      • Open items agreed with client
      • Open items not agreed
      Choose one
    2. 5.2

      Open snag references

      Reference, owner and target date for each.

      ↳ Shown when Snag list status is not All closed

      Notes
  6. 6.Keys, access and credentials

    Every physical and digital key, logged by who received it.

    1. 6.1

      Handed over

      CheckHanded overRetained by usN/A
      Keys, cabinet and isolator keys○○○
      Fobs and access cards○○○
      Charger RFID cards○○○
      Admin usernames and passwords○○○
      Monitoring portal access○○○
      Software licences and subscriptions○○○
      Cloud or portal account ownership○○○
      Checklist grid
    2. 6.2

      Item list with quantities

      e.g. 3 × cabinet keys, 12 × RFID cards. Send passwords by a secure route, not on this form.

      Notes
    3. 6.3

      Photo of keys and items handed over

      Photo
  7. 7.Warranties and aftercare

    1. 7.1

      Warranty start dateRequired

      Date
    2. 7.2

      Warranty period(months)

      Reading
    3. 7.3

      Aftercare arrangementRequired

      • Service agreement in place
      • Warranty only
      • Ad hoc call-outs
      • None
      Choose one
    4. 7.4

      Support contact and fault reporting route explainedRequired

      • Yes
      • No
      Yes / No
    5. 7.5

      Next planned maintenance visit

      ↳ Shown when Aftercare arrangement is Service agreement in place

      Date
    6. 7.6

      Checked by (project manager)Required

      Signature
    7. 7.7

      Received by (client)Required

      Signature

Handover checklist from Integrio, free to use and adapt. Run it on phones, offline, with photos and signatures: integrio.app · Free 7-day trial, no credit card required.

From the field

How do you get the most from a handover checklist?

01

Start the checklist at kick-off

Attach it to the project on day one. Chasing a manufacturer's warranty in week one is easy; finding it after the engineers have moved on isn't.

02

Keep passwords off the form

Record that admin access was handed over and to whom, but send the credentials themselves through a secure route, not on a PDF that gets emailed round.

03

Log what you keep, too

If you hold a spare key or a service login for maintenance, record it as retained. It saves an awkward conversation when the client audits access.

04

Explain how to report a fault

Show the client exactly how to raise a fault, whether by phone, email, portal or the QR code on the kit, before you leave. The first call goes better for both of you.

Frequently asked questions

What do people ask about the handover checklist?

Ask our team →

Is this handover checklist free?

+

Yes. Copy the sections into your own checklist, print them, or set them up in Integrio, where the checklist sits on the project alongside the snag list, photos and sign-off.

What is the difference between a handover checklist and a sign-off form?

+

The handover checklist is your own check that the client has everything: documents, training, keys, warranties. The sign-off form is the client's acceptance of the work. Complete the checklist first, so nothing is missing when the client signs.

Do I have to hand over a health and safety file?

+

Not usually as an installer. Under CDM 2015 the principal designer prepares the health and safety file and passes it to the client at the end of the project, or the principal contractor does where there is no principal designer. Your job is normally to give them the information they need for it.

Source: CDM 2015, regulation 12

What goes in an MCS solar PV handover pack?

+

Under MCS MIS 3002, the pack includes copies of all forms and checklists used to commission the system, the maintenance requirements and services available, manufacturer manuals and warranty details, and any incentive scheme paperwork. At handover the installer also gives a signed declaration listing the key components installed and the recommended interval for the first periodic inspection. The MCS certificate follows once the installation is registered, within 10 working days of commissioning. Integrio holds the records; it does not issue MCS certificates.

Source: MCS MIS 3002: The Solar PV Installation Standard, issue 6.0

What is regulation 38 fire safety information?

+

Where it applies, regulation 38 of the Building Regulations 2010 requires the person carrying out the work to give fire safety information about the building, its services, fittings and equipment to the responsible person, no later than completion or occupation. If your systems form part of the fire strategy, expect to supply information for it.

Source: Building Regulations 2010, regulation 38

How do I use this template in Integrio?

+

Build the checklist in the Integrio Form Builder, which is on the Office User plan at £65 per user per month, with mandatory fields and conditional questions. Engineers fill it in on the mobile app, offline if need be, on the Field Service User plan at £15. Upload manuals and warranties to the project folders, and track warranty expiry in the helpdesk.

Stop retyping paper forms

Run the handover checklist on your team's phones.