Plan deliveries from the install programme, backwards
Start from the day each area is installed and work back. Kit that arrives weeks early needs storing and guarding; kit that arrives late stands a crew down.
Free form template · Plan & deliver
A delivery schedule for installers: one entry per delivery, planned before it's booked and completed when it lands, so the right kit reaches the right place when the crew needs it.
Free 7-day trial · no credit card required
Template
Delivery schedule template
Project and site address *
Site contact for deliveries *
Deliveries must be booked with the site *
Delivery date *
Time slot *
Received and checked by *
A delivery schedule should list, for each delivery: the supplier and purchase order, the items and quantities, the number of pallets and heaviest item, the date and time slot, how the vehicle gets in and is unloaded, who meets it, where the goods are stored, and who received and checked them, with any shortages or damage.
Last updated .
Who uses it
Project managers and coordinators planning deliveries for an installation project, and whoever receives the goods on site or at the warehouse.
When
When orders are placed, again when each slot is confirmed with the supplier and site, and on the day each delivery arrives.
In Integrio
Build it once in the Form Builder (Office User), attach it to projects, and your team fills it in on iOS or Android, offline if needed.
Free template · integrio.app/forms/delivery-schedule-template/Delivery schedule template for installation projects
A delivery schedule for installers: one entry per delivery, planned before it's booked and completed when it lands, so the right kit reaches the right place when the crew needs it.
| Project | Site | Completed by | Date |
The template
5 sections and 29 fields. Copy them into any format, print this page, or set the form up in Integrio.
Filled in once per project; applies to every delivery below.
Project and site addressRequired
Site contact for deliveriesRequired
Name and phone number the driver can call.
Permitted delivery hours
e.g. weekdays 8:00–15:00, no deliveries during school drop-off.
Deliveries must be booked with the siteRequired
One entry per delivery.
Delivery referenceRequired
e.g. DEL-03. Numbered in order of arrival.
SupplierRequired
Purchase order numberRequired
Items and quantitiesRequired
Or attach the order confirmation.
Needed for (install phase or area)
e.g. Block B roof, phase 2 chargers.
Number of pallets(pallets)
Heaviest single item(kg)
Decides how it can be unloaded.
Delivery dateRequired
Time slotRequired
Timed slot
↳ Shown when Time slot is Timed slot
StatusRequired
Site booking reference
↳ Shown when deliveries must be booked with the site
Delivery pointRequired
Gate, loading bay or compound the driver should use.
Vehicle limits
Unloading methodRequired
Who meets the driverRequired
Stored atRequired
Exact location
e.g. container 2, level 3 plant room.
Move to install area by
Completed on the day. Use the equipment delivery checklist for the line-by-line check.
Date and time arrivedRequired
ResultRequired
Discrepancy details
↳ Shown when Result is anything other than Complete and undamaged
Photos
↳ Shown when Result is anything other than Complete and undamaged
Follow-up delivery date
↳ Shown when Result is Short, Damaged or Wrong items
Received and checked byRequired
Delivery schedule template from Integrio, free to use and adapt. Run it on phones, offline, with photos and signatures: integrio.app · Free 7-day trial, no credit card required.
From the field
Start from the day each area is installed and work back. Kit that arrives weeks early needs storing and guarding; kit that arrives late stands a crew down.
Pallet count, vehicle size and whether it has a tail-lift decide whether you need a forklift or a crane. Find out when you book, not when the lorry is at the gate.
“Site will take it” is how pallets end up left at the wrong gate. Put one name and one phone number against every delivery.
Mark every delivery complete, short or damaged as it lands. A schedule that's only updated weekly can't tell you what's missing before the crew arrives.
Yes. Copy the fields into a spreadsheet, print them, or set them up in Integrio, where each delivery sits on the project alongside the products it contains.
The schedule is the plan across the whole project: which deliveries are coming, when, and how they'll be unloaded and stored. The equipment delivery checklist is the goods-in check for one delivery, line by line against the order.
Delivery schedules in Integrio track incoming and outgoing items for each project and flag incomplete orders. Items are checked in by scanning their QR code, and with ERP integration a delivery schedule can be created from a purchase order.
Delivery schedules and the Form Builder are on the Office User plan (£65 per user per month). Whoever receives the goods completes the receipt and scans QR codes in the mobile app on the Field Service User plan (£15 per user per month), offline if needed.