Count boxes before the driver leaves
If the count is short or the pallet is crushed, note it on the carrier's paperwork. Signing clean and complaining later rarely works.
Free form template · Plan & deliver
A goods-in checklist for installers taking delivery of project equipment such as panels, inverters, batteries and chargers: check it against the order, record shortages, damage and serials, and where it's stored.
Free 7-day trial · no credit card required
Template
Equipment delivery checklist
Project and site *
Supplier *
Delivered to *
Photo of the delivery as it arrived *
Everything received as ordered? *
Signature *
An equipment delivery checklist should record the project, supplier, purchase order and delivery note; the carrier and date; pallet and package count and condition; each item checked against the order for quantity, model and serial; any shortage, wrong item or damage with photos; where the goods are stored; and who received them, with a signature.
Last updated .
Who uses it
Warehouse staff, site supervisors or engineers receiving equipment for a client project, at the warehouse or direct to site.
When
Every time a delivery arrives for a project, before the driver leaves if possible, and before any item is moved to the install area.
In Integrio
Build it once in the Form Builder (Office User), attach it to projects, and your team fills it in on iOS or Android, offline if needed.
Free template · integrio.app/forms/equipment-delivery-checklist/Equipment delivery checklist template
A goods-in checklist for installers taking delivery of project equipment such as panels, inverters, batteries and chargers: check it against the order, record shortages, damage and serials, and where it's stored.
| Project | Site | Completed by | Date |
The template
5 sections and 25 fields. Copy them into any format, print this page, or set the form up in Integrio.
Project and siteRequired
SupplierRequired
Purchase order numberRequired
Delivery note numberRequired
Carrier
Date receivedRequired
Delivered toRequired
Check before signing the carrier's paperwork.
Pallets or packages expected(packages)
Pallets or packages receivedRequired(packages)
Outer packaging conditionRequired
Photo of the delivery as it arrivedRequired
Pallet, labels and any visible damage, before unwrapping.
Signed for asRequired
Open and check every line, not just the box count.
Line checksRequired
| Check | Yes | No |
|---|---|---|
| Quantities match the delivery note | ○ | ○ |
| Delivery note matches the purchase order | ○ | ○ |
| Models and part numbers correct | ○ | ○ |
| Mounting kits, connectors, cables and accessories included | ○ | ○ |
| Items undamaged once unpacked | ○ | ○ |
Serial numbers recorded
Upload a photo or list of serial labels (panel flash lists, inverter, battery and charger serials), or record serials on each product.
Everything received as ordered?Required
Problem type
↳ Shown when “Everything received as ordered?” is No
Items and quantities affected
↳ Shown when “Everything received as ordered?” is No
Photos of damage or wrong items
↳ Shown when Problem type includes Damaged item or Wrong item
Supplier notified
Check your supplier's and carrier's deadline for reporting damage.
↳ Shown when “Everything received as ordered?” is No
Impact on the install
↳ Shown when “Everything received as ordered?” is No
Stored atRequired
e.g. warehouse bay 4, site compound, locked container.
Stored to the manufacturer's instructions
e.g. panels flat and dry, batteries within the stated temperature range.
Labelled with project and install locationRequired
Received byRequired
SignatureRequired
Equipment delivery checklist from Integrio, free to use and adapt. Run it on phones, offline, with photos and signatures: integrio.app · Free 7-day trial, no credit card required.
From the field
If the count is short or the pallet is crushed, note it on the carrier's paperwork. Signing clean and complaining later rarely works.
The delivery note tells you what the supplier sent, not what you ordered. Short lines often show up only against the purchase order.
Mounting clamps, connectors and comms cards are what's usually missing, and they're what stops the install on the day.
Mark each pallet with the roof, building or car park it's going to. Kit stored by project ends up on the wrong site by the second week.
Yes. Use the fields on this page on paper, in a spreadsheet, or in Integrio, where deliveries are checked in against the project from a phone.
Photograph it before unwrapping, note the damage on the carrier's paperwork, record the affected items on the checklist, and report it to the supplier straight away. Deadlines for reporting damage vary between suppliers and carriers, so check their terms.
Where you can, yes. Recording serials at goods-in ties each item to the order and makes install, handover and warranty claims easier. If boxes stay sealed until install, record serials then instead.
Delivery schedules in Integrio track incoming and outgoing items for a project, flag incomplete orders, and let you check items in by scanning their QR code. With ERP integration, purchase orders can be imported to create the delivery schedule.
Build it in the Integrio Form Builder on the Office User plan (£65 per user per month), where delivery schedules and product management also sit. Whoever receives the goods can complete it and scan QR codes in the mobile app on the Field Service User plan (£15), offline if needed.
Go deeper
Stop retyping paper forms