Installation checklist template

An installation checklist for solar PV, battery, EV charger and building services installers: confirm the area is ready, check workmanship as you go, and prove it's complete before commissioning.

Free 7-day trial · no credit card required

5
Sections
22
Fields
10
Field types

What should an installation checklist include?

An installation checklist should confirm, before work starts, that drawings, access, permits, materials and containment are ready; during the job, that equipment, fixings, cabling, isolation, terminations and labelling meet the specification; and at completion, that tests are recorded, the area is clean, deviations are logged, snags are raised and the supervisor has signed it off.

Last updated . Facts checked on 30 September 2026 against BSI: BS EN 50174-1, cabling installation specification and quality assurance.

Who uses it

Installation engineers and site supervisors, per area or per floor, as a quality record for their own work.

When

At the start of each work area, during the install for hidden work such as roof fixings, cable routes and ducts, and at completion before commissioning.

In Integrio

Build it once in the Form Builder (Office User), attach it to projects, and your team fills it in on iOS or Android, offline if needed.

IntegrioFree template · integrio.app/forms/installation-checklist/

Installation checklist template

An installation checklist for solar PV, battery, EV charger and building services installers: confirm the area is ready, check workmanship as you go, and prove it's complete before commissioning.

Project
Site
Completed by
Date

The template

What's in the installation checklist?

5 sections and 22 fields. Copy them into any format, print this page, or set the form up in Integrio.

  1. 1.Job and area

    1. 1.1

      Project and siteRequired

      Text
    2. 1.2

      Area, roof, bays or rooms coveredRequired

      Text
    3. 1.3

      Installation typeRequired

      • Solar PV
      • Battery storage
      • EV charging
      • Electrical
      • BMS and controls
      • Fire and security
      • IoT and sensors
      • Structured cabling and network
      • Other
      Choose any
    4. 1.4

      Lead installerRequired

      Text
    5. 1.5

      Start dateRequired

      Date
  2. 2.Before you start

    Stop and raise it now, not after the work is covered up.

    1. 2.1

      Pre-install checksRequired

      CheckYesNoN/A
      Latest drawings and specification on site○○○
      RAMS briefed and signed○○○
      Permits in place (roof access, hot works, isolation)○○○
      Area clear, accessible and access equipment in place○○○
      Containment and back boxes in place○○○
      Supply, distribution board and isolation points as designed○○○
      All equipment and materials delivered○○○
      Checklist grid
    2. 2.2

      Ready to start?Required

      • Yes
      • No
      Yes / No
    3. 2.3

      What's blocking the start

      Who needs to clear it, and by when.

      ↳ Shown when “Ready to start?” is No

      Notes
    4. 2.4

      Photo of the area before work

      Record existing damage before you're blamed for it.

      Photo
  3. 3.During installation

    Check workmanship while it's still visible.

    1. 3.1

      Workmanship checksRequired

      CheckPassFailN/A
      Equipment positioned to drawings○○○
      Fixings rated for the substrate they go into○○○
      Mounting system and roof fixings to the manufacturer's instructions○○○
      Cables supported and protected, bend radius respected○○○
      DC, AC and data cabling segregated as specified○○○
      Isolators and protective devices fitted where designed○○○
      Fire-stopping reinstated where penetrated○○○
      Terminations tidy and to standard○○○
      Cables, isolators and equipment labelled to the schedule○○○
      Checklist grid
    2. 3.2

      Photos of work before it's coveredRequired

      Roof fixings, cable routes, ceiling voids, ducts and ground works for charger bays.

      Photo
    3. 3.3

      Workmanship issues found

      ↳ Shown when any workmanship check is Fail

      Notes
  4. 4.Deviations from design

    1. 4.1

      Any changes from the drawings?Required

      • Yes
      • No
      Yes / No
    2. 4.2

      What changed and why

      ↳ Shown when “Any changes from the drawings?” is Yes

      Notes
    3. 4.3

      Approved by

      Name of the designer or client who agreed it.

      ↳ Shown when “Any changes from the drawings?” is Yes

      Text
  5. 5.Completion

    1. 5.1

      Test results uploaded

      Export from the tester, e.g. electrical or cable test results.

      File upload
    2. 5.2

      Completion checksRequired

      CheckYesNoN/A
      Serials recorded for every panel, inverter, battery and charger○○○
      Roof, ceiling tiles and access panels made good○○○
      Area clean, packaging removed○○○
      Spares and offcuts returned or removed○○○
      As-installed changes marked on drawings○○○
      Checklist grid
    3. 5.3

      Snags raised(snags)

      Raise each one on the snag list; record the count here.

      Reading
    4. 5.4

      Ready for commissioning?Required

      • Yes
      • No
      Yes / No
    5. 5.5

      Photo of the finished areaRequired

      Photo
    6. 5.6

      Completed byRequired

      Text
    7. 5.7

      Supervisor signatureRequired

      Signature

Installation checklist from Integrio, free to use and adapt. Run it on phones, offline, with photos and signatures: integrio.app · Free 7-day trial, no credit card required.

From the field

How do you get the most from a installation checklist?

01

Photograph it before it's covered

Once the panels are down or the trench is backfilled, a photo is the only proof the fixings and cable runs were right. Take one per roof section, per route.

02

Refuse to start an unready area

Missing containment or a locked plant room recorded at 8am is a variation. Discovered at 3pm, it's a lost day on your cost.

03

Log deviations when they happen

Write down the change and who agreed it on the day. At handover nobody remembers the conversation, only the drawing.

04

Hand commissioning a finished area

Don't sign an area complete with open roof sections or missing serials. Commissioning engineers then spend their day installing.

Frequently asked questions

What do people ask about the installation checklist?

Ask our team →

Is this installation checklist template free?

+

Yes. Print it, copy it into a spreadsheet, or set it up in Integrio so each engineer completes it on a phone with photos and a signature.

Can I use it for network and data cabling too?

+

Yes. The workmanship checks cover containment, segregation, bend radius, terminations and labelling, and the completion section takes the tester export. BS EN 50174-1 covers installation specification and quality assurance for IT cabling, and BS 6701 adds UK installation requirements, so check which your specification names.

Sources: BSI: BS EN 50174-1, cabling installation specification and quality assurance, BSI: BS 6701, telecommunications equipment and cabling installation

Does Integrio test or certify installations?

+

No. Use your test instruments and upload their results to the checklist, and issue certificates through your own scheme. Integrio holds the record alongside the photos and sign-off.

How is this different from a commissioning checklist?

+

Installation is about whether the work was fitted correctly. Commissioning, which comes next, tests whether the system works. MCS MIS 3002, for example, treats installation, set to work, commissioning and handover as separate stages of a solar PV job.

Source: MCS MIS 3002: The Solar PV Installation Standard, issue 6.0

How do I use this template in Integrio?

+

Build it in the Integrio Form Builder, which is on the Office User plan (£65 per user per month), and attach it to each area of the project. Engineers fill it in on the Field Service User plan (£15), offline if needed; it syncs when they reconnect.

Stop retyping paper forms

Run the installation checklist on your team's phones.