Free form template · Install & commission

Snag list template

A snag list template gives every defect the same record: exact location, trade, priority, owner and a photo of the fix. Use it on paper, in a spreadsheet, or in Integrio.

Free 7-day trial · no credit card required

5
Sections
22
Fields
8
Field types

What should a snag list template include?

A snag list template should record, for each snag: a reference, the exact location, the trade responsible, a fault type, a priority, a description of what 'fixed' means, a photo, an owner with a target date, a status, and close-out evidence showing who fixed it and who verified it.

Last updated . Facts checked on 30 September 2026 against Designing Buildings Wiki: Snagging construction works.

Who uses it

Installers, site supervisors and project managers snagging their own work, or clearing a list issued by a main contractor or client.

When

Before the main contractor's snag inspection, at practical completion, and for defects raised during the rectification period.

In Integrio

Build it once in the Form Builder (Office User), attach it to projects, and your team fills it in on iOS or Android, offline if needed.

IntegrioFree template · integrio.app/forms/snag-list-template/

Snag list template

A snag list template gives every defect the same record: exact location, trade, priority, owner and a photo of the fix. Use it on paper, in a spreadsheet, or in Integrio.

Project
Site
Completed by
Date

The template

What's in the snag list template?

5 sections and 22 fields. Copy them into any format, print this page, or set the form up in Integrio.

  1. 1.Snag details

    Filled in once per snag, on the spot.

    1. 1.1

      Snag reference

      Numbered automatically in Integrio, e.g. SNG-014.

      Text
    2. 1.2

      Project and siteRequired

      Text
    3. 1.3

      Date raisedRequired

      Date
    4. 1.4

      Raised byRequired

      Text
  2. 2.Where it is

    Precise enough that someone who wasn't there can walk straight to it.

    1. 2.1

      Building and floorRequired

      Text
    2. 2.2

      Room or areaRequired

      Text
    3. 2.3

      Exact position

      e.g. roof array B row 3, car park bay 12, plant room panel 2.

      Text
  3. 3.What's wrong

    1. 3.1

      System or tradeRequired

      • Solar PV
      • Battery storage
      • EV charging
      • Electrical
      • Mechanical and BMS
      • Fire and security
      • Data and networks
      • Civils and groundworks
      • Finishes
      • Other
      Dropdown
    2. 3.2

      Fault typeRequired

      • Missing
      • Damaged
      • Incorrect
      • Incomplete
      • Not working
      • Not labelled
      Choose one
    3. 3.3

      PriorityRequired

      • Urgent: safety risk or blocks handover
      • High: fix before practical completion
      • Normal: fix before client sign-off
      • Low: next scheduled visit
      Choose one
    4. 3.4

      DescriptionRequired

      What's wrong, and what 'fixed' looks like.

      Notes
    5. 3.5

      Photo of the snagRequired

      Mark up the photo to point at the fault.

      Photo
  4. 4.Who owns it

    1. 4.1

      Whose snag is it?Required

      Stops you fixing other people's damage for free.

      • Ours
      • Another trade
      • Client change or damage
      Choose one
    2. 4.2

      Other trade responsible

      ↳ Shown when “Whose snag is it?” is Another trade

      Text
    3. 4.3

      Assigned toRequired

      Text
    4. 4.4

      Target dateRequired

      Date
  5. 5.Close-out

    A snag isn't closed until someone can see it's fixed.

    1. 5.1

      StatusRequired

      • Open
      • In progress
      • Resolved
      Choose one
    2. 5.2

      Photo of the fix

      Same angle as the original photo.

      ↳ Shown when Status is Resolved

      Photo
    3. 5.3

      Fixed by

      ↳ Shown when Status is Resolved

      Text
    4. 5.4

      Date fixed

      ↳ Shown when Status is Resolved

      Date
    5. 5.5

      Verified by (supervisor)

      ↳ Shown when Status is Resolved

      Signature
    6. 5.6

      Client or main contractor accepted

      • Yes
      • No
      Yes / No

Snag list template from Integrio, free to use and adapt. Run it on phones, offline, with photos and signatures: integrio.app · Free 7-day trial, no credit card required.

From the field

How do you get the most from a snag list template?

01

Snag your own work first

Walk your areas before the main contractor's inspection. Every snag you close first is one that never appears on someone else's list.

02

Write what 'fixed' means

“Charger label wrong” leads to an argument; “replace bay 12 label with the ID on the schedule” gets closed.

03

Record whose snag it is

Damage by another trade or a late client change should be logged as theirs, with a photo, before you touch it.

04

Close with a matching photo

Take the fix photo from the same angle as the original. Side by side, nobody needs to revisit to check.

Frequently asked questions

What do people ask about the snag list template?

Ask our team →

Is this snag list template free?

+

Yes. Use the fields on this page in any format: print it, copy it into a spreadsheet, or set it up in Integrio, where snags are raised from the phone with a marked-up photo and tracked to close-out.

When is a snag list drawn up?

+

The main snagging inspection usually happens shortly before practical completion, and the list is prepared by the architect, contract administrator or employer's agent. Defects that appear after practical completion are dealt with in the rectification period, typically six to twelve months under JCT contracts.

Sources: Designing Buildings Wiki: Snagging construction works, Designing Buildings Wiki: Defects liability period

How do I prioritise snags?

+

Use a short fixed scale everyone understands. This template uses four levels: urgent (safety risk or blocks handover), high (before practical completion), normal (before client sign-off) and low (next visit).

Can I use it for solar, EV and M&E snags as well as building work?

+

Yes. The system or trade field covers solar PV, battery storage, EV charging, electrical, mechanical, fire and security and data, and the exact position field takes array rows and car park bays as well as room locations.

How do I use this template in Integrio?

+