Snag your own work first
Walk your areas before the main contractor's inspection. Every snag you close first is one that never appears on someone else's list.
Free form template · Install & commission
A snag list template gives every defect the same record: exact location, trade, priority, owner and a photo of the fix. Use it on paper, in a spreadsheet, or in Integrio.
Free 7-day trial · no credit card required
Template
Snag list template
Snag reference
Project and site *
System or trade *
Fault type *
Photo of the snag *
Client or main contractor accepted
A snag list template should record, for each snag: a reference, the exact location, the trade responsible, a fault type, a priority, a description of what 'fixed' means, a photo, an owner with a target date, a status, and close-out evidence showing who fixed it and who verified it.
Last updated . Facts checked on 30 September 2026 against Designing Buildings Wiki: Snagging construction works.
Who uses it
Installers, site supervisors and project managers snagging their own work, or clearing a list issued by a main contractor or client.
When
Before the main contractor's snag inspection, at practical completion, and for defects raised during the rectification period.
In Integrio
Build it once in the Form Builder (Office User), attach it to projects, and your team fills it in on iOS or Android, offline if needed.
Free template · integrio.app/forms/snag-list-template/Snag list template
A snag list template gives every defect the same record: exact location, trade, priority, owner and a photo of the fix. Use it on paper, in a spreadsheet, or in Integrio.
| Project | Site | Completed by | Date |
The template
5 sections and 22 fields. Copy them into any format, print this page, or set the form up in Integrio.
Filled in once per snag, on the spot.
Snag reference
Numbered automatically in Integrio, e.g. SNG-014.
Project and siteRequired
Date raisedRequired
Raised byRequired
Precise enough that someone who wasn't there can walk straight to it.
Building and floorRequired
Room or areaRequired
Exact position
e.g. roof array B row 3, car park bay 12, plant room panel 2.
System or tradeRequired
Fault typeRequired
PriorityRequired
DescriptionRequired
What's wrong, and what 'fixed' looks like.
Photo of the snagRequired
Mark up the photo to point at the fault.
Whose snag is it?Required
Stops you fixing other people's damage for free.
Other trade responsible
↳ Shown when “Whose snag is it?” is Another trade
Assigned toRequired
Target dateRequired
A snag isn't closed until someone can see it's fixed.
StatusRequired
Photo of the fix
Same angle as the original photo.
↳ Shown when Status is Resolved
Fixed by
↳ Shown when Status is Resolved
Date fixed
↳ Shown when Status is Resolved
Verified by (supervisor)
↳ Shown when Status is Resolved
Client or main contractor accepted
Snag list template from Integrio, free to use and adapt. Run it on phones, offline, with photos and signatures: integrio.app · Free 7-day trial, no credit card required.
From the field
Walk your areas before the main contractor's inspection. Every snag you close first is one that never appears on someone else's list.
“Charger label wrong” leads to an argument; “replace bay 12 label with the ID on the schedule” gets closed.
Damage by another trade or a late client change should be logged as theirs, with a photo, before you touch it.
Take the fix photo from the same angle as the original. Side by side, nobody needs to revisit to check.
Yes. Use the fields on this page in any format: print it, copy it into a spreadsheet, or set it up in Integrio, where snags are raised from the phone with a marked-up photo and tracked to close-out.
The main snagging inspection usually happens shortly before practical completion, and the list is prepared by the architect, contract administrator or employer's agent. Defects that appear after practical completion are dealt with in the rectification period, typically six to twelve months under JCT contracts.
Sources: Designing Buildings Wiki: Snagging construction works, Designing Buildings Wiki: Defects liability period
Use a short fixed scale everyone understands. This template uses four levels: urgent (safety risk or blocks handover), high (before practical completion), normal (before client sign-off) and low (next visit).
Yes. The system or trade field covers solar PV, battery storage, EV charging, electrical, mechanical, fire and security and data, and the exact position field takes array rows and car park bays as well as room locations.
Snagging in Integrio already records fault type, priority, description, location, annotated photos, assignee, deadline and status, and exports the list as PDF or Excel. To add your own fields, build the form in the Integrio Form Builder, which is on the Office User plan.
Go deeper
Stop retyping paper forms