Capture the serial before it disappears
Record the serial while the product is still in reach. Once a panel is on the roof or an inverter is boxed in, nobody goes back for it.
Free form template · Install & commission
A per-product commissioning checklist for solar PV, battery, EV charger and building services installers: identify the product, run the pre-checks, record each test and reading, and sign it off.
Free 7-day trial · no credit card required
Template
Commissioning checklist
Project and site *
Building, floor and room *
System *
Is the product networked? *
Photo of the installed product and its label *
Result *
A commissioning checklist should identify the product (location, make, model, serial, rating and any network details), confirm the pre-commissioning checks, record each test with its result and any readings with units, show what was done about failures and the retest, and end with the engineer's and witness's signatures. Follow the tests your standard, commissioning plan or manufacturer specifies.
Last updated . Facts checked on 30 September 2026 against Approved Document L Volume 2, Section 8 and MCS MIS 3002: The Solar PV Installation Standard, issue 6.0.
Who uses it
Commissioning engineers and installers testing each product they have fitted, such as an inverter, battery or charge point, often with a client, consultant or main contractor witnessing.
When
Once installation and pre-commissioning checks are complete, before the system is handed over, and again for any retest after a fail.
In Integrio
Build it once in the Form Builder (Office User), attach it to projects, and your team fills it in on iOS or Android, offline if needed.
Free template · integrio.app/forms/commissioning-checklist/Commissioning checklist template for installers
A per-product commissioning checklist for solar PV, battery, EV charger and building services installers: identify the product, run the pre-checks, record each test and reading, and sign it off.
| Project | Site | Completed by | Date |
The template
6 sections and 32 fields. Copy them into any format, print this page, or set the form up in Integrio.
Enough to find the product again and know exactly what was tested.
Project and siteRequired
Building, floor and roomRequired
Position
e.g. roof array B string 3, car park bay 12, plant room panel 3.
SystemRequired
Product typeRequired
e.g. inverter, battery module, charge point, controller, sensor.
Make and modelRequired
Serial numberRequired
Rating
e.g. 50 kW inverter, 100 kWh battery, 22 kW charger.
Asset tag or label reference
Skip for products with no network connection. Inverters, batteries, charge points and controllers often have one.
Is the product networked?Required
IP address
↳ Shown when “Is the product networked?” is Yes
MAC address
↳ Shown when “Is the product networked?” is Yes
VLAN and switch port
e.g. VLAN 30, SW-02 port 17, or 4G router.
↳ Shown when “Is the product networked?” is Yes
Firmware version
Done before powering up or testing function.
Pre-commissioning checksRequired
| Check | Pass | Fail | N/A |
|---|---|---|---|
| Installed to drawings and specification | ○ | ○ | ○ |
| Mounted securely, fixings correct | ○ | ○ | ○ |
| Cabling terminated and labelled both ends | ○ | ○ | ○ |
| Power supply correct and protected | ○ | ○ | ○ |
| Product and isolators labelled to the schedule | ○ | ○ | ○ |
| No visible damage | ○ | ○ | ○ |
| Manufacturer's installation checks done | ○ | ○ | ○ |
Pre-check notes
Anything failed above, and what was done about it.
Use the tests your standard, commissioning plan or the manufacturer specifies for this product.
Test procedure or plan reference
e.g. commissioning plan section, BS EN 62446-1 test report, or manufacturer's procedure.
Tests carried outRequired
One line per test: what was done and what was expected.
Key reading
Record the unit alongside, e.g. string voltage, insulation resistance or setpoint.
Reading unit
e.g. V, A, MΩ, kW, °C.
Photo of the installed product and its labelRequired
ResultRequired
What failed
↳ Shown when Result is Fail
Remedial action
↳ Shown when Result is Fail
Retest result
↳ Shown when Remedial action is Fixed and retested
Retest date
↳ Shown when Remedial action is Fixed and retested
The product isn't commissioned until someone has put their name to it.
Commissioning engineerRequired
Date commissionedRequired
Engineer signatureRequired
Witnessed?
Witness name and company
↳ Shown when Witnessed? is Yes
Witness signature
↳ Shown when Witnessed? is Yes
Commissioning checklist from Integrio, free to use and adapt. Run it on phones, offline, with photos and signatures: integrio.app · Free 7-day trial, no credit card required.
From the field
Record the serial while the product is still in reach. Once a panel is on the roof or an inverter is boxed in, nobody goes back for it.
“Check setpoint” can't fail. “Setpoint 21 °C, reads within 0.5 °C of reference” can, which is the point.
A fail followed by a clean retest is good evidence. A separate retest sheet with no link to the fail looks like something was hidden.
If the client or consultant must witness, agree the date and the products first. Retesting because nobody was there costs a day.
Yes. Use the fields on this page however you like: print them, put them in a spreadsheet, or build them into Integrio so every product is tested the same way on a phone.
For fixed building services in England, such as heating, hot water, air conditioning, mechanical ventilation, fixed lighting and their controls, yes. Under regulation 44 the installer must notify building control that commissioning followed an approved procedure. Approved Document L Volume 2 describes commissioning as testing and adjusting as necessary, following manufacturers' instructions. For MCS solar PV installs, MIS 3002 requires commissioning to a documented procedure, with inspection and testing to the IET Code of Practice. Other work is usually set by the contract and specification.
Sources: Building Regulations 2010, regulation 44, Approved Document L Volume 2, Section 8, MCS MIS 3002: The Solar PV Installation Standard, issue 6.0
No. On larger jobs Approved Document L expects a commissioning plan naming the systems to test, the tests, the schedule, roles and documentation. BSRIA publishes a model plan (BG 8/2009). This checklist is the per-product record you fill in against that plan.
Sources: Approved Document L Volume 2, Section 8, BSRIA BG 8/2009 Model Commissioning Plan
Yes. The system dropdown and the network section cover them all, and the tests section takes whatever your standard, plan or the manufacturer specifies. For MCS solar PV work, keep the completed checklists: MIS 3002 lists copies of all forms and checklists used to commission the system as part of the handover pack.
Source: MCS MIS 3002: The Solar PV Installation Standard, issue 6.0
Build it once in the Integrio Form Builder, which is on the Office User plan (£65 per user per month), and attach it to products so it must be completed before project sign-off. Engineers fill it in on the mobile app on the Field Service User plan (£15 per user per month), offline if needed, and it syncs when they're back online.